1
Perioada de actualizare
de la 11.06.2026 13:44
până la 24.06.2026 10:00
2
Propunerea ofertelor
de la 24.06.2026 10:00
până la 16.07.2026 09:00
au rămas 14 zile
3
Licitaţie
nu va fi folosită
4
Evaluare

5
Contract

Statut Propunerea ofertelor
Valoarea estimată fără TVA 234 500 EUR
Perioada clarificărilor: 11 iun 2026, 13:44 - 24 iun 2026, 10:00
Perioada de depunere a ofertelor: 24 iun 2026, 10:00 - 16 iul 2026, 9:00

Suport Tehnic pentru furnizori:

(+373) 79999801


Aceasta procedura se va desfășura fară licitație electronică. Oferta Dvs. este finală și trebuie să conțină toată lista de documente cerută de documentația de atribuire.

Publicitate
Abonează-te
Publicitate

Financed under the Interreg VI-A NEXT Romania – Republic of Moldova Programme 2021-2027

Informaţia despre solicitant
Codul fiscal/IDNO
Adresa
MD2004, MOLDOVA, mun.Chişinău, mun.Chişinău, bd. Stefan cel Mare nr. 168
Web site
---
Persoana de contact
Nume Prenume
Olga Gherman
Telefonul de contact
(022) 23-35-03
Datele achizitiei
Data publicării
11 iun 2026, 13:44
Data ultimilor modificări
19 iun 2026, 10:49
Achizitii.md ID
21631478
CPV
32500000-8 - Echipament de telecomunicaţii
Tipul procedurii
Licitație deschisă
Criteriu de atribuire
Cel mai bun raport preț - calitate
Surse de finanțare
Publicitate
Documentele procedurii de achiziție
11. c1. Administrative Compliance Grid.docx
Documentele la ofertă
-
11.06.26 13:44
13. d1. Tender Form.docx
Documentele la ofertă
-
11.06.26 13:44
6. b2. Special Conditions.docx
Documentele la ofertă
-
11.06.26 13:44
14. d2. Declaration on Honour.docx
Documentele la ofertă
-
11.06.26 13:44
8. b4. Annex iv_Financial Offer.docx
Documentele la ofertă
-
11.06.26 13:44
2.2. Task Book_Technical Specifications_en.docx
Documentele la ofertă
-
11.06.26 13:44
5. b1. Draft Contract.docx
Documentele la ofertă
-
11.06.26 13:44
15. sp6_Tender Guarantee.docx
Documentele la ofertă
-
11.06.26 13:44
16. sp7_Performance Guarantee.docx
Documentele la ofertă
-
11.06.26 13:44
1. Invitation to Tender.pdf 1. Invitation to Tender.pdf
Documentele la ofertă
-
11.06.26 13:44
2.1. Caiet de Sarcini_Specificații Tehnice_ro.docx
Documentele la ofertă
-
11.06.26 13:44
9. b5. Legal Entity Form.pdf 9. b5. Legal Entity Form.pdf
Documentele la ofertă
-
11.06.26 13:44
7. b3. Annex ii+iii _Technical Specifications Offer.docx
Documentele la ofertă
-
11.06.26 13:44
12. c2. Evaluation Grid.docx
Documentele la ofertă
-
11.06.26 13:44
4. a2. Instructions to Tenderers.docx
Documentele la ofertă
-
11.06.26 13:44
17. Declaration.docx
Documentele la ofertă
-
11.06.26 13:44
3. a1. Contract Notice.docx
Documentele la ofertă
-
11.06.26 13:44
Data:
19 iun 2026, 10:49
Subiectul întrebării:
Clarifications on Subcontractor Documentation and Declarations
Întrebare:
I. Regarding the documents/information to be provided by a subcontractor: 1. Based on the listed requirements, it can be concluded that a subcontractor should provide a separate document covering items 3–7 of the “D. Tender Form for a Supply Contract” template, as well as the Declaration of honor. Could you please confirm whether the subcontractor is also required to submit: a. financial statements/reports supporting Item 3; and b. reference contract(s) supporting Item 6? or c. any other documents 2. Please clarify how the “7. Tenderer’s Declaration(s)” should be completed by a subcontractor, as some statements do not appear applicable to an entity providing only specific services or a limited portion of the scope rather than delivering an entire lot. Example: points 2–4, 6, partially point 8 (“We are making this tender in our own right”), and point 10 (“We confirm that we, including all consortium members, if any, and subcontractors, are not included in the EU restrictive measures lists.”). Is it permissible to amend or redact the declaration to reflect the subcontractor’s role, or is there a separate template intended for subcontractors? 3. Is the subcontractor also expected to provide the Legal Entity File (Form G5) and the Financial Identification Form (Form G4), as referenced in point 7 of the “Tenderer’s Declaration(s)”? Alternatively, should this requirement be adjusted for the declaration submitted by a subcontractor? II. The current wording on the p. 1.3 from “Draft contract” and 6.2 of the “Special conditions” states that the Implementation Phase may last up to 7 months from contract start, while the Exploitation Phase should begin no later than month 7. This wording suggests a potential overlap between the two phases. If this is not the intention, the recommendation would be to review the wording
Răspuns (19 iun 2026, 15:38):
I. Regarding the documents/information to be provided by a subcontractor: 1. A subcontractor must submit financial statements (D1 pt.3) and reference contracts (D1 pt.6) only if its capacity is relied upon by the tenderer to meet a selection criterion (i.e., it acts as a capacity-providing entity per D1 footnote [2] and the "Capacity-providing entities" section). In that case the data is submitted as a separate document, with evidence provided on request. 2. The same Tenderer's Declaration template (D1 pt.7) is used by subcontractors — there is no separate template. Points describing the scope of the tender (pt.2) and the tendering capacity (pt.8) should be adapted to reflect that the entity signs as subcontractor for the specific goos/services it will perform, not the full Lot. Exclusion/integrity points (9, 10, 11, 13, 14) must be completed in full, without redaction, as required by A2 §3.1. 3. D1 point 7 literally states, within the declaration text used by every signatory including subcontractors: "We attach the legal entity file (form G5) and the financial identification form (form G4)." Read literally, and without supplementing the text with an unstated exception, this clause currently requires every signatory of point 7, including subcontractors, to attach both forms. II. Faza de Implementare/Exploatare: Cele două condiții din B1/B2 sunt secvențiale, nu suprapuse: Faza de Exploatare începe doar după validarea formală a Fazei de Implementare finalizate, iar acest început nu poate depăși luna 7. Deoarece Faza de Implementare este limitată tot la 7 luni, ambele condiții converg către același plafon. Nu este prevăzută derularea simultană a celor două faze.
Data:
19 iun 2026, 16:51
Subiectul întrebării:
Clarifications on Subcontractor Documentation and Declarations
Întrebare:
- On the Tenderer's Declaration template (D1 pt.7) to be signed by the sub-contractor: o Is it expected points 3 & 4 should be completed? Or they will remain blank? o How do we interpret point 6 in a declaration signed by a sub-contractor? Is this point to be excluded?
Răspuns (22 iun 2026, 10:00):
Sub-points 3 (price), 4 (discount) and 6 (performance guarantee) of point 7 of the Tenderer's Declaration (D1) concern the financial/contractual offer submitted to the Contracting Authority, an obligation assumed solely by the tenderer, not the sub-contractor; accordingly, these sub-points do not apply to the sub-contractor and should be explicitly marked "Not applicable" rather than left blank, to avoid being read as an omission during the administrative compliance review.
Doar utilizatorii autorizați ai platformei pot să adreseze întrebări în perioada de clarificări.